THUNDER BAY – The first phase of work on the bridge near the Nakina Drive entrance at Confederation College’s Thunder Bay campus is complete.
As of Friday, the bridge has reopened to vehicle and pedestrian traffic. In addition, bus stops and vehicle drop-off locations on campus will revert to standard locations.
At the same time, vehicles will be able to use the loop at the east entrance of the Shuniah building for drop-offs/pick-ups. Bus stops will return to their regular locations as follows:
- Shuniah building – west entrance
- McIntyre building/Sibley Hall residence – east and southeast of the McIntyre building
The bus shuttle service offered during construction between the McIntyre and Shuniah buildings will no longer be in service.
Note that the City of Thunder Bay’s still-in-progress pedestrian bridge, located next to the Nakina/Atikokan Dr. bridge, will remain closed to all traffic.
The second and final phase of the project will be completed in the spring of 2019.